Build

MAX Plant is manufactured in Australian and overseas using our team of fabricators through Australia, Malaysia and Thailand with steel available in the local markets as denoted by the engineering calculations.

The welding standard adhered to is AS1554 GP/SP.

For ease of maintenance conveyor walkways are 750mm wide. Platforms around the crushers and screens are typically 1m to 1.2m with larger areas in the main maintenance positions.